House Progress: The Mother Lode, Part 2

As promised, here are the pictures from our addition. We turned our 2 bedroom, 1.5 bathroom into a 4 bedroom, 2 bathroom house with this addition. The addition is not terribly large (less than 500 square feet) but it consists of two bedrooms: the master and an office, a small laundry room, a master bathroom, and a hallway that includes a small amount of mudroom space. We aimed to make efficient use of space and not build something that feels totally different from the small spaces of our 1940s house. We also had building challenges with our weird property lines and set backs, but that’s another story for another time. Once we got into some real planning for this endeavor, we realized it was important to tackle everything that would make us consider moving in the foreseeable future. We feel like we accomplished that.

There is so much I want to explain about this whole process, but I’ll have to think more on what exactly to include (I feel like we could write a book!).

So, without further ado…

IMG_3554

This is a progression of the master bedroom end of the addition looking into the house.

IMG_3621

IMG_3678

IMG_4766

The office

IMG_4731

IMG_3946

IMG_3876

IMG_5535

IMG_3679

The Laundry room. Almost not worth showing and the room looks crooked, but we still haven’t done much in there…yet.

The Master bedroom.

IMG_5458

IMG_5462

IMG_5454

Our heavenly master bath.

IMG_3754

IMG_5455

 

Advertisements

Leave a comment

Filed under DIY projects, home improvements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s